Skip to content

Density Test Report

Date :04/29/2025
Project No :2024C213
Client Company :WDG
Arrival Time :04/29/2025 08:00
Onsite Hours :
Name of the Project :Covington Town Center PH II
Project Location :Covington, GA
Weather :
Departure Time :04/29/2025
ASEC Technician Name :Solomon Cherie

Observations/Finding

Test Date Test Number Moisture Content (%) Dry Density (pcf) Proctor Number Max. Dry Density (pcf) Optimum Moisture (%) Compaction (%) Specified Compaction (%) ASTM Test Method Pass/Fail
04/29/2025 1 28 94.6 ASECP001 106.0 18.2 89.2 95 D6938 Fail
Location : Fire wall pipe backfill, Elv/Depth :2 feet below finished grade
Comment : In-situ moisture contents well above optimum moistures. Scarify, aerate and recompact. Gauge Serial No. :30942
04/29/2025 2 27.5 93.3 ASECP001 106.0 18.2 88.0 95 D6938 Fail
Location : Fire wall pipe backfill, Elv/Depth :2 feet below finished grade
Comment : In-situ moisture contents well above optimum moistures. Scarify, aerate and recompact. Gauge Serial No. :30942
Technician Signature / DateSolomon Cherie, April 29, 2025
Reviewer Name / DateKenneth Mosman, May 04, 2025