Density Test Report

Date :04/29/2025
Project No :2025C150
Client Company :Davidson Homes
Arrival Time :04/29/2025 07:45
Onsite Hours :9:15
Name of the Project :Riverwood Retaining Wall
Project Location :Dallas
Weather :partly sunny
Departure Time :04/29/2025 17:00
ASEC Technician Name :Vamsi Polisetty

Observations/Finding

Test Date Test Number Moisture Content (%) Dry Density (pcf) Proctor Number Max. Dry Density (pcf) Optimum Moisture (%) Compaction (%) Specified Compaction (%) ASTM Test Method Pass/Fail
04/29/2025 1 18.3 94.1 2025-019 SP 95.8 21.5 98.2 95 D6938 Pass
Location : Lot #225 (next to Lot #226), Elv/Depth :sixth lift
Comment : Gauge Serial No. :29588
04/29/2025 2 18.4 93.8 2025-019 SP 95.8 21.5 97.9 95 D6938 Pass
Location : Lot #226 (next to Lot #227), Elv/Depth :Fifth lift
Comment : Gauge Serial No. :29588
04/29/2025 3 20.0 94.9 2025-019 SP 95.8 21.5 99.1 95 D6938 Pass
Location : Lot #227 (next to Lot #228), Elv/Depth :Fifth lift
Comment : Gauge Serial No. :
04/29/2025 4 16.7 99.1 2025-019 SP 95.8 21.5 103.4 95 D6938 Pass
Location : Lot #228 (next to Lot #229), Elv/Depth :Fifth lift
Comment : Gauge Serial No. :29588
04/29/2025 5 18.7 92.3 2025-019 SP 95.8 21.5 96.3 95 D6938 Pass
Location : Lot #229, Elv/Depth :Fifth lift
Comment : Gauge Serial No. :29588
Technician Signature / DateVamsi Polisetty, April 29, 2025
Reviewer Name / DateKenneth Mosman, May 04, 2025