Daily Field Report
Observations/Finding
As requested, the site was visited by our AS Engineering and Consulting (ASEC) representative for the purpose of providing quality control inspection and testing services. Visual observation techniques were employed to verify compliance with project drawing/specifications, applicable codes, and materials submittals. The following observations were observed on site this day.
Following up on the progress from the previous day, work has continued behind Lots #224 to #229. The contractor has made progress in the preparation of the retaining wall foundation and the Lots #224 through #229.
Backfilling and compaction activities were performed within Lots #224 to #229. The contractor utilized a Kobelco 310LC excavator to place the fill material in designated areas. Following placement, the material was transported and uniformly distributed across the lots using a Bobcat 265 and Takeuchi TL12R2 compact track loaders. Once the fill was spread, compaction operations commenced using a Bomag BW211 sheeps-foot roller.
Nuclear gauge density testing was performed near each individual lot and also adjacent to the retaining wall to evaluate moisture content and dry density. The results showed compaction levels exceeding 95% in some locations but falling short in others. Based on this data, the superintendent was advised to dedicate additional time to compaction in areas with insufficient density. After re-compaction, general probing and proof-rolling tests were performed. No severe deflections were noted.
Upon successful compaction of the lift, the contractor advanced to the next layer of backfill. This subsequent layer underwent the same testing and quality control process. Both general probing and proof-rolling tests verified stability of surficial soils. Near the wall the compaction was carried out with a remote compactor BMP8500 for compaction along the retaining wall.
We appreciate the opportunity to be of service to you on this project. If you have any questions regarding this report, please feel free to contact us. We will be more than happy to discuss it with you.