Daily Field Report
Observations/Finding
The field report you provided details quality control (QC) observations conducted by Amin Azimi of AS ENGINEERING AND CONSULTING, LLC (ASEC) at Concourse B, Gate B9, at Hartsfield-Jackson Atlanta International Airport. Here’s a concise summary of the key activities and findings:
Field Observations Summary
-
Flowable Fill Installation: Observed the placement of 32 cubic yards of flowable fill around two 1,500-gallon grease interceptors.
-
Spall Preparation: The contractor removed loose rock, debris, and standing water from the base of three spalls to prepare for repairs.
-
Reinforcement Bars: Rebar within the spalls was found to have epoxy coating, with embedment lengths noted as per specifications.
-
QC Sampling: Sampling for the spalls was not performed during this shift, as Manhattan representative Timothy Rutledge indicated it was unnecessary.
-
Spall Dimensions: Three spall areas were documented with the following dimensions:
-
22” x 9” x 5.5”
-
22” x 12.5” x 5.5”
-
30” x 12.5” x 5”
-
Photographs were taken to document the locations and conditions of these spalls.