Skip to content

Density Test Report

Date :05/09/2025
Project No :2025C150
Client Company :Davidson Homes
Arrival Time :05/09/2025 08:00
Onsite Hours :08:00
Name of the Project :Riverwood Retaining Wall
Project Location :Dallas
Weather :partly cloudy
Departure Time :05/09/2025 16:00
ASEC Technician Name :Vamsi Polisetty

Observations/Finding

Test Date Test Number Moisture Content (%) Dry Density (pcf) Proctor Number Max. Dry Density (pcf) Optimum Moisture (%) Compaction (%) Specified Compaction (%) ASTM Test Method Pass/Fail
05/09/2025 1 20.0 92.6 2025-019 SP 95.8 21.5 96.7 95 D6938 Pass
Location : Lot #228 (next to Lot #229), Elv/Depth :Next lift
Comment : Gauge Serial No. :29588
05/09/2025 2 17.6 100.1 2025-015 SP 102.8 18.1 97.4 95 D6938 Pass
Location : Lot #229, Elv/Depth :Next lift
Comment : Gauge Serial No. :29588
05/09/2025 3 16.3 104.9 2025-015 SP 102.8 18.1 102.0 95 D6938 Pass
Location : Lot #228 (next to Lot #229), Elv/Depth :Next lift
Comment : Gauge Serial No. :29588
05/09/2025 4 20.0 94.9 2025-019 SP 95.8 21.5 99.1 95 D6938 Pass
Location : Lot #229, Elv/Depth :Next lift
Comment : Gauge Serial No. :29588
05/09/2025 5 17.1 89.4 2025-021 SP 97.2 18.6 92.0 95 D6938 Fail
Location : Lot #228 (next to Lot #229), Elv/Depth :Next lift
Comment : Recommended recompaction prior to additional backfill placement. Gauge Serial No. :29588
05/09/2025 6 18.0 96.1 2025-019 SP 95.8 21.5 100.3 95 D6938 Pass
Location : Lot #229, Elv/Depth :Next lift
Comment : Gauge Serial No. :29588
05/09/2025 7 16.7 106.3 2025-015 SP 102.8 18.1 103.4 95 D6938 Pass
Location : Lot #228, Elv/Depth :Next lift
Comment : Gauge Serial No. :29588
05/09/2025 8 15.5 92.7 2025-021 SP 97.2 18.6 95.4 95 D6938 Pass
Location : Lot #228, Elv/Depth :Next lift
Comment : Gauge Serial No. :29588
Technician Signature / DateVamsi Polisetty, May 9, 2025
Reviewer Name / DateKenneth Mosman, May 15, 2025