Density Test Report

Date :04/23/2025
Project No :2025C149
Client Company :Davidson Homes
Arrival Time :04/23/2025 9:30
Onsite Hours :08:00
Name of the Project :Grove at E. Thompson Mill Rd
Project Location :Buford
Weather :cloudy
Departure Time :04/23/2025 17:30
ASEC Technician Name :Aminullah Azimi

Observations/Finding

Test Date Test Number Moisture Content (%) Dry Density (pcf) Proctor Number Max. Dry Density (pcf) Optimum Moisture (%) Compaction (%) Specified Compaction (%) ASTM Test Method Pass/Fail
04/23/2025 1 19.3 98.9 2025-023 SP 103.5 18.9 95.6 90 D6938 Pass
Location : pond-1 perimeter , Elv/Depth :10 feet below finished grade
Comment : Gauge Serial No. :85759
04/23/2025 2 23.5 95.9 2025-023 SP 103.5 18.9 92.7 90 D6938 Pass
Location : pond-1 perimeter, Elv/Depth :9 feet below finished grade
Comment : Gauge Serial No. :85759
04/23/2025 3 19.1 98.2 2025-023 SP 103.5 18.9 94.9 90 D6938 Pass
Location : pond-1 permiter, Elv/Depth :9 feet below finished grade
Comment : Gauge Serial No. :85759
04/23/2025 4 17.8 99.2 2025-023 SP 103.5 18.9 95.8 90 D6938 Pass
Location : pond-1 perimeter, Elv/Depth :8.5 feet below finished grade
Comment : Gauge Serial No. :85759
04/23/2025 5 22.1 95.9 2025-023 SP 103.5 18.9 92.7 90 D6938 Pass
Location : pond-1 perimeter , Elv/Depth :8.5 feet below finished grade
Comment : Gauge Serial No. :85759
Technician Signature / DateAminullah Azimi, April 23, 2025