Concrete Test Report
Date :05/22/2025
Project No :2024C314
Client Company :Manhatten Const.
Arrival Time :05/21/2025 23:45
Onsite Hours :05:45
Name of the Project :Concourse B Grease Receptors
Project Location :HJAIA
Weather :
Departure Time :05/22/2025 05:30
ASEC Technician Name :Solomon Cherie
Concrete Placement Information
Location(S):
N/A
Testing:
1 Set of concrete specimens (7 per set) were cast during the cast-in-place concrete pour at the above referenced location, in accordance with ASTM C31. The specimen will remain on site for the initial 24-48 hrs curing.
Compliance:
Field placement of concrete appeared to be in accordance with the project specifications (i.e., slump, temperature, etc) (refer to remarks below)
Deviations and/or noncompliances were noted during the field placement (refer to remarks below)
Specimen
Pick Up: 1 Sets of concrete specimens/ 7 specimen per set were picked up & transported to AS Engineering and Consulting LLC (ASEC) for curing and testing in accordance with ASTM C39, C670/1231
Pick Up: 1 Sets of concrete specimens/ 7 specimen per set were picked up & transported to AS Engineering and Consulting LLC (ASEC) for curing and testing in accordance with ASTM C39, C670/1231
Field Curing:
Specimen were stored for the initial 24 hours.
Near the poured structure
In an insulated curing box
Other
Remarks:
One set of seven beams of concrete was casted after taking slump, temperature, air and unit weight tests.
Technician Signature / DateSolomon Cherie, May 22, 2025
Reviewer Name / DateKenneth Mosman, June 09, 2025