Date :05/23/2025
Project No :2024C217
Client Company :Artisan
Arrival Time :05/23/2025 12:00
Onsite Hours :02:00
Name of the Project :Naturewalk - 7 Hills Amenities
Project Location :Dallas
Weather :sunny
Departure Time :05/23/2025 14:
ASEC Technician Name :Mahendra Mylabathula

Observations/Finding

As requested, the site was visited by our AS Engineering and Consulting (ASEC) representative for the purpose of providing quality control inspection and testing services. Visual observation techniques were employed to verify compliance with project drawing/specifications, applicable codes, and materials
submittals. The following observations were observed on site this day.

Nature Walk: Footing Inspection (Lot #1082): On May 23, 2025, a Dynamic Cone Penetrometer (DCP) test was conducted on all sides of Lot #1082. Approximately ten (10) Dynamic Cone Penetration (DCP) tests were performed across this lot. In all cases, rock was encountered just below a depth of one foot. Additionally, in one of the test locations, a root approximately 2 feet in length was discovered at a depth of 6 inches. Rock material was also observed along the edges of the lot during the investigation.

We appreciate the opportunity to be of service to you on this project. If you have any questions regarding this report, please feel free to contact us. We will be more than happy to discuss it with you

Technician Signature / DateMahendra Mylabathula, May 23, 2025
Reviewer Name / DateKenneth Mosman, June 09, 2025