Density Test Report

Date :04/21/2025
Project No :2025C160
Client Company :Artisan
Arrival Time :04/21/2025 08:00
Onsite Hours :05:00
Name of the Project :Rockmart Township - 115 Felton Drive
Project Location :Rockmart
Weather :Sunny
Departure Time :04/21/2025 13:00
ASEC Technician Name :Sean Willett

Observations/Finding

Test Date Test Number Moisture Content (%) Dry Density (pcf) Proctor Number Max. Dry Density (pcf) Optimum Moisture (%) Compaction (%) Specified Compaction (%) ASTM Test Method Pass/Fail
04/21/2025 1 15.5 111.3 2025-011 SP 115.0 15.5 96.8 95 D2937 Pass
Location : SSMH1,0B, Elv/Depth :6 feet over pipeline
Comment :
04/21/2025 2 25.0 98.6 2025-011 SP 115.0 15.5 85.7 95 D2937 Fail
Location : SSMH1.0A, Elv/Depth :6 feet over pipeline
Comment : In-situ moisture content much higher than optimum. Recommended scarification, aeration and recompaction.
04/21/2025 3 18.3 100.5 2025-012 SP 105.6 18.9 95.2 95 D2937 Pass
Location : SSMH2.0, Elv/Depth :4 feet over pipeline
Comment :
Technician Signature / DateSean Willett, April 21, 2025
Reviewer Name / DateKenneth Mosman, June 23, 2025