- Home
- Density Test Report Report ID: 82091
- This project is inactive from admin. Download Report
Density Test Report
Date :06/11/2025
Project No :2025C160
Client Company :Artisan
Arrival Time :06/11/2025 09:00
Onsite Hours :
Name of the Project :Rockmart Township - 115 Felton Drive
Project Location :Rockmart
Weather :Sunny
Departure Time :06/11/2025
ASEC Technician Name :Sean Willett
Observations/Finding
| Test Date | Test Number | Moisture Content (%) | Dry Density (pcf) | Proctor Number | Max. Dry Density (pcf) | Optimum Moisture (%) | Compaction (%) | Specified Compaction (%) | ASTM Test Method | Pass/Fail |
|---|---|---|---|---|---|---|---|---|---|---|
| 06/11/2025 | 1 | 19.0 | 97.1 | 2025-012 SP | 105.6 | 18.9 | 92.0 | 95 | D2937 | Fail |
| Location : | Lot #1, Elv/Depth :753 | |||||||||
| Comment : | Contractor informed of test results | |||||||||
| 06/11/2025 | 2 | 23.1 | 93.9 | 2025-012 SP | 105.6 | 18.9 | 88.9 | 95 | D2937 | Fail |
| Location : | Lot #1, Elv/Depth :753 | |||||||||
| Comment : | Contractor informed of test results | |||||||||
| 06/11/2025 | 3 | 15.4 | 102.3 | 2025-012 SP | 105.6 | 18.9 | Check | |||
| Location : | Lot #1, Elv/Depth :753 | |||||||||
| Comment : | Proctor check | |||||||||
Technician Signature / DateSean Willett, June 11, 2025
Reviewer Name / DateKenneth Mosman, August 05, 2025
