Skip to content

Density Test Report

Date :06/11/2025
Project No :2025C160
Client Company :Artisan
Arrival Time :06/11/2025 09:00
Onsite Hours :
Name of the Project :Rockmart Township - 115 Felton Drive
Project Location :Rockmart
Weather :Sunny
Departure Time :06/11/2025
ASEC Technician Name :Sean Willett

Observations/Finding

Test Date Test Number Moisture Content (%) Dry Density (pcf) Proctor Number Max. Dry Density (pcf) Optimum Moisture (%) Compaction (%) Specified Compaction (%) ASTM Test Method Pass/Fail
06/11/2025 4 19.7 98.4 2025-012 SP 105.6 18.9 93.2 95 D2937 Fail
Location : SSMH4.3, Elv/Depth :4 feet over pipeline
Comment : Recommend to recompact backfill
06/11/2025 5 24.7 88.0 2025-012 SP 105.6 18.9 83.3 95 D2937 Fail
Location : Middle of pipeline SSMH4.3 TO SSMH5.0, Elv/Depth :4 feet over pipeline
Comment : Recommend waiting until optimum moisture content lowered before recompaction. Contractor will mix in drier material
Technician Signature / DateSean Willett, June 11, 2025
Reviewer Name / DateKenneth Mosman, August 05, 2025