Density Test Report

Date :06/11/2025
Project No :2025C160
Client Company :Artisan
Arrival Time :06/11/2025 09:00
Onsite Hours :
Name of the Project :Rockmart Township - 115 Felton Drive
Project Location :Rockmart
Weather :Sunny
Departure Time :06/11/2025
ASEC Technician Name :Sean Willett

Observations/Finding

Test Date Test Number Moisture Content (%) Dry Density (pcf) Proctor Number Max. Dry Density (pcf) Optimum Moisture (%) Compaction (%) Specified Compaction (%) ASTM Test Method Pass/Fail
06/11/2025 7 20.8 96.6 2025-012 SP 105.6 18.9 91.5 95 D2937 Fail
Location : SSMH4.3 , Elv/Depth :6 feet over pipeline
Comment : Test results provided to contractor
06/11/2025 8 23.3 90.8 2025-012 SP 105.6 18.9 86.0 95 D2937 Fail
Location : Lot #1, Elv/Depth :757
Comment : Test results provided to contractor
Technician Signature / DateSean Willett, June 11, 2025
Reviewer Name / DateKenneth Mosman, August 05, 2025