- Density Test Report Report ID: 82110
- Edit Download Report
Density Test Report
Date :06/12/2025
Project No :2025C160
Client Company :Artisan
Arrival Time :06/12/2025 08:30
Onsite Hours :
Name of the Project :Rockmart Township - 115 Felton Drive
Project Location :Rockmart
Weather :Sunny
Departure Time :06/12/2025
ASEC Technician Name :Sean Willett
Observations/Finding
| Test Date | Test Number | Moisture Content (%) | Dry Density (pcf) | Proctor Number | Max. Dry Density (pcf) | Optimum Moisture (%) | Compaction (%) | Specified Compaction (%) | ASTM Test Method | Pass/Fail |
|---|---|---|---|---|---|---|---|---|---|---|
| 06/12/2025 | 1 | 21.0 | 92.1 | 2025-012 SP | 105.6 | 18.9 | 87.2 | 95 | D2937 | Fail |
| Location : | Lot #130, Elv/Depth :773.5 | |||||||||
| Comment : | Contractor notified of results | |||||||||
| 06/11/2025 | 2 | 24.5 | 90.8 | 2025-012 SP | 105.6 | 18.9 | 86.0 | 95 | D2937 | Fail |
| Location : | Lot #129, Elv/Depth :775 | |||||||||
| Comment : | Contractor notified of results | |||||||||
| 06/12/2025 | 3 | 17.5 | 107.7 | 2025-012 SP | 105.6 | 18.9 | Check | |||
| Location : | Lot #130, Elv/Depth :775 | |||||||||
| Comment : | Proctor check for Lots #127 through #133 | |||||||||
Technician Signature / DateSean Willett, June 12, 2025
Reviewer Name / DateKenneth Mosman, August 05, 2025