Density Test Report
Date :05/06/2025
Project No :2025C160
Client Company :Artisan
Arrival Time :05/06/2025 07:30
Onsite Hours :06:00
Name of the Project :Rockmart Township - 115 Felton Drive
Project Location :Rockmart
Weather :sunny
Departure Time :05/06/2025 13:30
ASEC Technician Name :Sean Willett
Observations/Finding
| Test Date | Test Number | Moisture Content (%) | Dry Density (pcf) | Proctor Number | Max. Dry Density (pcf) | Optimum Moisture (%) | Compaction (%) | Specified Compaction (%) | ASTM Test Method | Pass/Fail |
|---|---|---|---|---|---|---|---|---|---|---|
| 05/06/2025 | 1 | 17.6 | 0.0 | 2025-012 SP | 105.6 | 18.9 | 0.0 | 0 | D2937 | Fail |
| Location : | Lot #36, Elv/Depth :4 feet below finished grade | |||||||||
| Comment : | Moisture content check | |||||||||
| 05/06/2025 | 2 | 15.3 | 102.3 | 2025-012 SP | 105.6 | 18.9 | 96.9 | 95 | D2937 | Pass |
| Location : | Lot #36, Elv/Depth :4 feet below finished grade | |||||||||
| Comment : | ||||||||||
| 05/06/2025 | 3 | 11.3 | 105.0 | 2025-012 SP | 105.6 | 18.9 | 99.4 | 95 | D2937 | Pass |
| Location : | Lot #32, Elv/Depth :4 feet below finished grade | |||||||||
| Comment : | In-situ moisture content measured well under optimum moisture. | |||||||||
Technician Signature / DateSean Willett, May 6, 2025
Reviewer Name / DateKenneth Mosman, June 23, 2025