- Concrete Test Report Report ID: 82262
- Edit Download Report
Concrete Test Report
Date :06/17/2025
Project No :2023C159
Client Company :CW Matthews
Arrival Time :06/16/2025 21:45
Onsite Hours :10:15
Name of the Project :Airfield Repairs 2021-23
Project Location :HJAIA, Atlanta, GA
Weather :
Departure Time :06/17/2025 08:00
ASEC Technician Name :Solomon Cherie
Concrete Placement Information
Location(S):
N/A
Testing:
1 Set of concrete specimens (4 per set) were cast during the cast-in-place concrete pour at the above referenced location, in accordance with ASTM C31. The specimen will remain on site for the initial 24-48 hrs curing.
Compliance:
Field placement of concrete appeared to be in accordance with the project specifications (i.e., slump, temperature, etc) (refer to remarks below)
Deviations and/or noncompliances were noted during the field placement (refer to remarks below)
Specimen
Pick Up: 1 Sets of concrete specimens/ 4 specimen per set were picked up & transported to AS Engineering and Consulting LLC (ASEC) for curing and testing in accordance with ASTM C39, C670/1231
Pick Up: 1 Sets of concrete specimens/ 4 specimen per set were picked up & transported to AS Engineering and Consulting LLC (ASEC) for curing and testing in accordance with ASTM C39, C670/1231
Field Curing:
Specimen were stored for the initial 24 hours.
Near the poured structure
In an insulated curing box
Other
Remarks:
Technician Signature / DateSolomon Cherie, June 17, 2025
Reviewer Name / DateKenneth Mosman, August 05, 2025