Daily Field Report

Date :06/18/2025
Project No :2024C202
Client Company :CCG
Arrival Time :06/18/2025 07:30
Onsite Hours :02:00
Name of the Project :Old Griffin Rd - Hawthorne Reserve
Project Location :Dallas
Weather :cloudy
Departure Time :06/18/2025 09:30
ASEC Technician Name :Clyde Smith

Observations/Finding

As requested, the site was visited by our AS Engineering and Consulting (ASEC) representative for the purpose of providing quality control inspection and testing services. Visual observation techniques were employed to verify compliance with project drawing/specifications, applicable codes, and materials submittals. The following observations were observed on site this day.

Our ASEC representative visited the above site as requested to continue observations of roadway subgrade soils and recommended repairs.  It appears that an overnight rain event delivered between 1″ to 1.5″ of water which caused severe eroding over previous placed base stone.  In some areas washed silt was observed over the previously repaired areas (base stone and tensor fabric in place) which will require remediation to remove the washed silt from the base stone to continue.   See pictures below.

We appreciate the opportunity to be of service to you on this project. If you have any questions regarding this report, please feel free to contact us. We will be more than happy to discuss it with you.

Technician Signature / DateClyde Smith, June 18, 2025
Reviewer Name / DateKenneth Mosman, July 17, 2025