Density Test Report
Date :06/21/2025
Project No :2025C160
Client Company :Artisan
Arrival Time :06/21/2025 07:30
Onsite Hours :
Name of the Project :Rockmart Township - 115 Felton Drive
Project Location :Rockmart
Weather :Sunny
Departure Time :06/21/2025
ASEC Technician Name :Sean Willett
Observations/Finding
| Test Date | Test Number | Moisture Content (%) | Dry Density (pcf) | Proctor Number | Max. Dry Density (pcf) | Optimum Moisture (%) | Compaction (%) | Specified Compaction (%) | ASTM Test Method | Pass/Fail |
|---|---|---|---|---|---|---|---|---|---|---|
| 06/21/2025 | 1 | 18.3 | 98.3 | 2025-012 SP | 105.6 | 18.9 | 93.1 | 90 | D2937 | Pass |
| Location : | Lot #168, Elv/Depth :793 | |||||||||
| Comment : | Contractor continued compaction as test was performed. | |||||||||
| 06/21/2025 | 2 | 18.5 | 97.3 | 2025-012 SP | 105.6 | 18.9 | 92.1 | 90 | D2937 | Pass |
| Location : | Lot #170, Elv/Depth :793 | |||||||||
| Comment : | Contractor continued compaction as test was performed. May have encountered a new fill material. Transported sample back to our lab. | |||||||||
Technician Signature / DateSean Willett, June 21, 2025
Reviewer Name / DateKenneth Mosman, August 06, 2025