Density Test Report

Date :06/11/2025
Project No :2025C149
Client Company :Davidson Homes
Arrival Time :06/11/2025 8:30
Onsite Hours :10:00
Name of the Project :Grove at E. Thompson Mill Rd
Project Location :Buford
Weather :cloudy
Departure Time :06/11/2025 18:30
ASEC Technician Name :Aminullah Azimi

Observations/Finding

Test Date Test Number Moisture Content (%) Dry Density (pcf) Proctor Number Max. Dry Density (pcf) Optimum Moisture (%) Compaction (%) Specified Compaction (%) ASTM Test Method Pass/Fail
06/11/2025 1 23.1 98.5 2025-023 SP 103.5 18.9 95.2 95 D6938 Pass
Location : Pond-1 perimeter , Elv/Depth :2.5 feet below finished grade
Comment : Gauge Serial No. :85759
06/11/2025 2 20.6 101.6 2025-023 SP 103.5 18.9 98.2 98 D6938 Pass
Location : Pond-1 perimeter, Elv/Depth :1 foot below finished grade
Comment : Gauge Serial No. :85759
06/11/2025 3 20.1 121.9 2025-023 SP 103.5 18.9 98.1 95 D6938 Pass
Location : Pond-1 perimeter , Elv/Depth :1 foot below finished grade
Comment : Gauge Serial No. :85759
06/11/2025 4 23.2 100.3 2025-023 SP 103.5 18.9 96.9 95 D6938 Pass
Location : Pond-1 perimeter, Elv/Depth :2 feet below finished grade
Comment : Gauge Serial No. :85759
06/11/2025 5 21 101.7 2025-023 SP 103.5 18.9 98.3 98 D6938 Pass
Location : Pond-2 perimeter , Elv/Depth :at finished grade
Comment : Gauge Serial No. :85759
06/11/2025 6 21.2 101.6 2025-023 SP 103.5 18.9 98.2 98 D6938 Pass
Location : Pond-2 perimeter , Elv/Depth :at finished grade
Comment : Gauge Serial No. :85759
06/11/2025 7 20.1 101.5 2025-023 SP 103.5 18.9 98.1 95 D6938 Pass
Location : Pond-1 perimeter , Elv/Depth :1 foot below finished grade
Comment : Gauge Serial No. :85759
06/11/2025 8 21.1 101.5 2025-023 SP 103.5 18.9 98.1 98 D6938 Pass
Location : Pond-2 perimeter , Elv/Depth :at finished grade
Comment : Gauge Serial No. :85759
06/11/2025 9 21.3 101.5 2025-023 SP 103.5 18.9 98.1 98 D6938 Pass
Location : Pond-1 perimeter , Elv/Depth :1 foot below finished grade
Comment : Gauge Serial No. :85759
06/11/2025 10 21.2 101.6 2025-023 SP 103.5 18.9 98.2 98 D6938 Pass
Location : Pond-1 perimeter , Elv/Depth :at finished grade
Comment : Gauge Serial No. :85759
06/11/2025 11 20.2 101.6 2025-023 SP 103.5 18.9 98.2 98 D6938 Pass
Location : Pond-1 perimeter , Elv/Depth :at finished grade
Comment : Gauge Serial No. :85759
06/11/2025 12 21.1 101.5 2025-023 SP 103.5 18.9 98.1 98 D6938 Pass
Location : Pond-1 perimeter , Elv/Depth :at finished grade
Comment : Gauge Serial No. :85759
Technician Signature / DateAminullah Azimi, June 11, 2025