Daily Field Report

Date :06/12/2025
Project No :2024C213
Client Company :WDG
Arrival Time :06/12/2025 8:00
Onsite Hours :02:30
Name of the Project :Covington Town Center PH II
Project Location :Covington, GA
Weather :sunny
Departure Time :06/12/2025 10:30
ASEC Technician Name :Aminullah Azimi

Observations/Finding

As requested, the site was visited by our AS Engineering and Consulting (ASEC) representative for the purpose of providing quality control inspection and testing services. Visual observation techniques were employed to verify compliance with project drawings, specifications, applicable codes, and approved material submittals.

During this visit, the contractor had excavated ten (10) trial test pits in proximity to the marker MHD-1 to determine the depth of the rock table and to assess the need for possible blasting operations. Measurements were taken to determine the horizontal distance between each of the ten excavated holes and the reference point MHD-1. These distances will be used to confirm spacing adequacy, alignment and correlation with anticipated subsurface profiles. and all information was given to the contractor.

We appreciate the opportunity to be of service to you on this project. If you have any questions regarding this report, please feel free to contact us. We will be more than happy to discuss it with you.

Technician Signature / DateAminullah Azimi, June 12, 2025
Reviewer Name / DateKenneth Mosman, July 17, 2025