Skip to content

Density Test Report

Date :06/24/2025
Project No :2025C160
Client Company :Artisan
Arrival Time :06/24/2025 10:00
Onsite Hours :
Name of the Project :Rockmart Township - 115 Felton Drive
Project Location :Rockmart
Weather :Sunny
Departure Time :06/24/2025
ASEC Technician Name :Sean Willett

Observations/Finding

Test Date Test Number Moisture Content (%) Dry Density (pcf) Proctor Number Max. Dry Density (pcf) Optimum Moisture (%) Compaction (%) Specified Compaction (%) ASTM Test Method Pass/Fail
06/24/2025 1 18.0 97.7 2025-012 SP 105.6 18.9 92.5 95 D2937 Fail
Location : Lot #168, Elv/Depth :794.4
Comment : Recompaction required.
06/24/2025 2 19.0 94.5 2025-012 SP 105.6 18.9 89.5 95 D2937 Fail
Location : Lot #170, Elv/Depth :794.4
Comment : Recompaction required.
Technician Signature / DateSean Willett, June 24, 2025
Reviewer Name / DateKenneth Mosman, August 06, 2025