Daily Field Report
Observations/Finding
As requested, the site was visited by our AS Engineering and Consulting (ASEC) representative for the purpose of providing quality control inspection and testing services. Visual observation techniques were employed to verify compliance with project drawing/specifications, applicable codes, and materials submittals. The following observations were observed on site this day.
Our ASEC representative was on site as requested by the contractor (Wilbanks) for the observation/testing of the placement of fill/backfill. Our representative observed the contractor (Randy) spread one lift of approximately 8 to 12 inches in thickness, across Lots #127 through #133. The contractor spread one lift across Lot #39 and Lots #80 through #82.
The technician observed the contractor (Robbie) continue working on SSMH 1.4 pipeline.
Lots #3 – #13 appear to have been grassed on the previous workday.
No testing was performed at this time.
We appreciate the opportunity to be of service to you on this project. If you have any questions regarding this report, please feel free to contact us. We will be more than happy to discuss it with you.