Skip to content

Density Test Report

Date :07/02/2025
Project No :2025C160
Client Company :Artisan
Arrival Time :07/02/2025 7:30
Onsite Hours :
Name of the Project :Rockmart Township - 115 Felton Drive
Project Location :Rockmart
Weather :Overcast
Departure Time :07/02/2025
ASEC Technician Name :Sean Willett

Observations/Finding

Test Date Test Number Moisture Content (%) Dry Density (pcf) Proctor Number Max. Dry Density (pcf) Optimum Moisture (%) Compaction (%) Specified Compaction (%) ASTM Test Method Pass/Fail
07/02/2025 1 17.8 95.3 2025-012 SP 105.6 18.9 90.2 95 D2937 Fail
Location : Approximately Lot #137, Elv/Depth :Approximately 1 foot from finished grade
Comment : Recompaction required.
07/02/2025 2 20.3 87.5 2025-012 SP 105.6 18.9 82.9 95 D2937 Fail
Location : Approximately Lot #138, Elv/Depth :Approximately 1 foot from finished grade
Comment : Used field Proctor 2025-FP1 DW:97.9 MC:20.7
07/02/2025 3 17.4 100.8 2025-012 SP 105.6 18.9 95.5 95 D2937 Pass
Location : Approximately Lot #157, Elv/Depth :783
Comment :
07/02/2025 4 14.1 101.4 2025-012 SP 105.6 18.9 96.0 95 D2937 Pass
Location : Approximately Lot #156, Elv/Depth :783.5
Comment :
Technician Signature / DateSean Willett, July 2, 2025
Reviewer Name / DateKenneth Mosman, August 07, 2025