- Home
- Daily Field Report Report ID: 82822
- Edit Download Report
Daily Field Report
Observations/Finding
As requested, a representative from AS Engineering and Consulting (ASEC) visited the site to perform quality control inspection and testing services. Visual observation techniques were employed to verify compliance with project drawings/specifications, applicable codes, and approved material submittals. The following observations were made during the site visit:
Continued proof-rolling of roadway areas and DCP testing on this day.
A proof-roll was continued on the road (location is shown in pictures) using a fully loaded tandem-axle dump truck. Multiple passes were made across the area. No significant yielding or deflection was observed during the proof-roll.
The proof-roll was observed by our representative, David Howell with Baldwin paving, Mike Keemer with Paulding DOT, and Goerge from CCG.
We appreciate the opportunity to support your project. If you have any questions regarding this report, please do not hesitate to contact us. We are happy to discuss our findings in greater detail.





