- Home
- Density Test Report Report ID: 82914
- Edit Download Report
Density Test Report
Date :07/09/2025
Project No :2025C160
Client Company :Artisan
Arrival Time :07/09/2025 10:30
Onsite Hours :04:00
Name of the Project :Rockmart Township - 115 Felton Drive
Project Location :Rockmart
Weather :Partly cloudy
Departure Time :07/09/2025 14:30
ASEC Technician Name :Austin Coleman
Observations/Finding
| Test Date | Test Number | Moisture Content (%) | Dry Density (pcf) | Proctor Number | Max. Dry Density (pcf) | Optimum Moisture (%) | Compaction (%) | Specified Compaction (%) | ASTM Test Method | Pass/Fail |
|---|---|---|---|---|---|---|---|---|---|---|
| 07/09/2025 | 1 | 26.6 | 90.4 | Field proctor | 0 | Check | ||||
| Location : | Lower lots, Elv/Depth :at finished grade | |||||||||
| Comment : | ||||||||||
| 07/09/2025 | 2 | 20 | 92.4 | 2025-025 SP | 104.5 | 13.2 | 88.4 | 95 | D6938 | Fail |
| Location : | Lower lots (west side), Elv/Depth :3 feet below finished grade | |||||||||
| Comment : | Measured at 95% compaction on the field proctor (possibly a different material) | Gauge Serial No. : | ||||||||
| 07/09/2025 | 3 | 20 | 93.7 | 2025-012 SP | 105.6 | 18.9 | 88.7 | 95 | D6938 | Fail |
| Location : | Lower lots (east side), Elv/Depth :3 feet below finished grade | |||||||||
| Comment : | Hit at 95.8% compaction on the field proctor | Gauge Serial No. : | ||||||||
Technician Signature / DateAustin Coleman, July 9, 2025
Reviewer Name / DateKenneth Mosman, August 07, 2025
