Date :07/14/2025
Project No :2025C160
Client Company :Artisan
Arrival Time :07/14/2025 08:30
Onsite Hours :
Name of the Project :Rockmart Township - 115 Felton Drive
Project Location :Rockmart
Weather :Sunny
Departure Time :07/14/2025
ASEC Technician Name :Sean Willett

Observations/Finding

Test Date Test Number Moisture Content (%) Dry Density (pcf) Proctor Number Max. Dry Density (pcf) Optimum Moisture (%) Compaction (%) Specified Compaction (%) ASTM Test Method Pass/Fail
07/14/2025 2 21.0 93.4 2025-012 SP 105.6 18.9 88.4 95 D2937 Fail
Location : Approximately Lots #153-154, Elv/Depth :6 feet below finished grade
Comment : This test based on a soil mixture (no proctor for this material). Will take an additional test.
07/14/2025 3 13.5 100.4 2025-012 SP 105.6 18.9 95.1 95 D2937 Pass
Location : Approximately Lots #153-154, Elv/Depth :6 feet below finished grade
Comment :
07/14/2025 4 21.7 94.6 2025-012 SP 105.6 18.9 89.6 95 D2937 Fail
Location : Approximately Lot #70, Elv/Depth :6 feet below finished grade
Comment : Requires recompaction
Technician Signature / DateSean Willett, July 14, 2025
Reviewer Name / DateKenneth Mosman, August 08, 2025