Density Test Report
Date :07/14/2025
Project No :2025C160
Client Company :Artisan
Arrival Time :07/14/2025 08:30
Onsite Hours :
Name of the Project :Rockmart Township - 115 Felton Drive
Project Location :Rockmart
Weather :Sunny
Departure Time :07/14/2025
ASEC Technician Name :Sean Willett
Observations/Finding
| Test Date | Test Number | Moisture Content (%) | Dry Density (pcf) | Proctor Number | Max. Dry Density (pcf) | Optimum Moisture (%) | Compaction (%) | Specified Compaction (%) | ASTM Test Method | Pass/Fail |
|---|---|---|---|---|---|---|---|---|---|---|
| 07/14/2025 | 2 | 21.0 | 93.4 | 2025-012 SP | 105.6 | 18.9 | 88.4 | 95 | D2937 | Fail |
| Location : | Approximately Lots #153-154, Elv/Depth :6 feet below finished grade | |||||||||
| Comment : | This test based on a soil mixture (no proctor for this material). Will take an additional test. | |||||||||
| 07/14/2025 | 3 | 13.5 | 100.4 | 2025-012 SP | 105.6 | 18.9 | 95.1 | 95 | D2937 | Pass |
| Location : | Approximately Lots #153-154, Elv/Depth :6 feet below finished grade | |||||||||
| Comment : | ||||||||||
| 07/14/2025 | 4 | 21.7 | 94.6 | 2025-012 SP | 105.6 | 18.9 | 89.6 | 95 | D2937 | Fail |
| Location : | Approximately Lot #70, Elv/Depth :6 feet below finished grade | |||||||||
| Comment : | Requires recompaction | |||||||||
Technician Signature / DateSean Willett, July 14, 2025
Reviewer Name / DateKenneth Mosman, August 08, 2025