Skip to content

Density Test Report

Date :07/21/2025
Project No :2024C217
Client Company :Artisan
Arrival Time :07/21/2025 09:00
Onsite Hours :06:30
Name of the Project :Naturewalk - 7 Hills Amenities
Project Location :Dallas
Weather :Mostly Cloudy
Departure Time :07/21/2025 15:30
ASEC Technician Name :Safiullah Momand

Observations/Finding

Test Date Test Number Moisture Content (%) Dry Density (pcf) Proctor Number Max. Dry Density (pcf) Optimum Moisture (%) Compaction (%) Specified Compaction (%) ASTM Test Method Pass/Fail
07/21/2025 1 1.1 129.3 2025-029MP 129.6 8.5 99.8 100 D6938 Fail
Location : Parking Lot at the right side of entrance road/ Sheally RD, Elv/Depth :at finished grade
Comment : Passed. It the time of proof rolling test Moisture and re-compaction is recommended. Gauge Serial No. :
07/21/2025 2 1.2 129.7 2025-029MP 129.6 8.5 100.1 100 D6938 Pass
Location : Parking Lot at the right side of entrance road/ Sheally RD, Elv/Depth :at finished grade
Comment : Passed. It the time of proof rolling test Moisture and re-compaction is recommended. Gauge Serial No. :
07/21/2025 3 1.4 137.9 2025-029MP 129.6 8.5 106.4 100 D6938 Pass
Location : Parking Lot at the right side of entrance road/ Sheally RD, Elv/Depth :at finished grade
Comment : Passed. It the time of proof rolling test Moisture and re-compaction is recommended. Gauge Serial No. :
07/21/2025 4 1.4 130.2 2025-029MP 129.6 8.5 100.5 100 D6938 Pass
Location : Parking Lot at the right side of entrance road/ Sheally RD, Elv/Depth :at finished grade
Comment : Passed. It the time of proof rolling test Moisture and re-compaction is recommended. Gauge Serial No. :
07/21/2025 5 1.4 138.1 2025-029MP 129.6 8.5 106.6 100 D6938 Pass
Location : Connection road to parking lot from entrance road/ Sheally RD, Elv/Depth :at finished grade
Comment : Passed. It the time of proof rolling test Moisture and re-compaction is recommended. Gauge Serial No. :
07/21/2025 6 1.2 133.1 2025-029MP 129.6 8.5 102.7 100 D6938 Pass
Location : Connection road to parking lot from entrance road/ Sheally RD, Elv/Depth :at finished grade
Comment : Passed. It the time of proof rolling test Moisture and re-compaction is recommended. Gauge Serial No. :
Technician Signature / DateSafiullah Momand, July 21, 2025
Reviewer Name / DateKenneth Mosman, August 08, 2025