- Home
- Concrete Test Report Report ID: 83269
- Edit Download Report
Concrete Test Report
Date :07/24/2025
Project No :2024C217
Client Company :Artisan
Arrival Time :07/24/2025 07:45
Onsite Hours :
Name of the Project :Naturewalk - 7 Hills Amenities
Project Location :Dallas
Weather :
Departure Time :07/24/2025
ASEC Technician Name :Solomon Cherie
Concrete Placement Information
Location(S):
N/A
Testing:
1 Set of concrete specimens (5 per set) were cast during the cast-in-place concrete pour at the above referenced location, in accordance with ASTM C31. The specimen will remain on site for the initial 24-48 hrs curing.
Compliance:
Field placement of concrete appeared to be in accordance with the project specifications (i.e., slump, temperature, etc) (refer to remarks below)
Deviations and/or noncompliances were noted during the field placement (refer to remarks below)
Specimen
Pick Up: 1 Sets of concrete specimens/ 5 specimen per set were picked up & transported to AS Engineering and Consulting LLC (ASEC) for curing and testing in accordance with ASTM C39, C670/1231
Pick Up: 1 Sets of concrete specimens/ 5 specimen per set were picked up & transported to AS Engineering and Consulting LLC (ASEC) for curing and testing in accordance with ASTM C39, C670/1231
Field Curing:
Specimen were stored for the initial 24 hours.
Near the poured structure
In an insulated curing box
Other
Remarks:
Concrete pour for the curve side was placed. The following measurements were performed:
1) Conc Temp = 85°F
2) Slump = 4.25"
3) Air = 2.5%
4) Unit weight = 169.5 pcf
Technician Signature / DateSolomon Cherie, July 24, 2025
Reviewer Name / DateKenneth Mosman, August 10, 2025