Skip to content

Density Test Report

Date :07/25/2025
Project No :2025C146
Client Company :Davidson Homes, LLC
Arrival Time :07/25/2025 12:00
Onsite Hours :
Name of the Project :Greene Farms Subdivision
Project Location :1451 Highway 113, Cartersville, Georgia
Weather :Sunny
Departure Time :07/25/2025
ASEC Technician Name :Sean Willett

Observations/Finding

Test Date Test Number Moisture Content (%) Dry Density (pcf) Proctor Number Max. Dry Density (pcf) Optimum Moisture (%) Compaction (%) Specified Compaction (%) ASTM Test Method Pass/Fail
07/25/2025 1 18.9 92.3 ASECP002 99.4 22.4 92.9 98 D2937 Fail
Location : Lot #48, Elv/Depth :at finished grade
Comment : Recompaction required
07/25/2025 2 20.6 94.1 ASECP002 99.4 22.4 94.7 98 D2937 Fail
Location : Lot #49, Elv/Depth :at finished grade
Comment : Recompaction required
07/25/2025 3 19.6 90.6 ASECP002 99.4 22.4 91.1 98 D2937 Fail
Location : Lot #50, Elv/Depth :at finished grade
Comment : Recompaction required
07/25/2025 4 23.5 89.9 ASECP002 99.4 22.4 90.4 98 D2937 Fail
Location : Lot #51, Elv/Depth :at finished grade
Comment : Recompaction required
07/25/2025 5 18.8 95.8 ASECP002 99.4 22.4 96.4 98 D2937 Fail
Location : Lot #52, Elv/Depth :at finished grade
Comment : Recompaction required
Technician Signature / DateSean Willett, July 25, 2025
Reviewer Name / DateKenneth Mosman, August 10, 2025