- Home
- Density Test Report Report ID: 83608
- Edit Download Report
Density Test Report
Date :07/29/2025
Project No :2025C160
Client Company :Artisan
Arrival Time :07/29/2025 08:30
Onsite Hours :
Name of the Project :Rockmart Township - 115 Felton Drive
Project Location :Rockmart
Weather :Sunny
Departure Time :07/29/2025
ASEC Technician Name :Sean Willett
Observations/Finding
| Test Date | Test Number | Moisture Content (%) | Dry Density (pcf) | Proctor Number | Max. Dry Density (pcf) | Optimum Moisture (%) | Compaction (%) | Specified Compaction (%) | ASTM Test Method | Pass/Fail |
|---|---|---|---|---|---|---|---|---|---|---|
| 07/29/2025 | 1 | 23.2 | 85.9 | 2025-012 SP | 105.6 | 18.9 | 81.3 | 95 | D2937 | Fail |
| Location : | Lot #200, Elv/Depth :802 | |||||||||
| Comment : | Cutting out last lift and re-compacting | |||||||||
| 07/29/2025 | 2 | 9.4 | 95.7 | 2025-012 SP | 105.6 | 18.9 | 90.6 | 95 | D2937 | Fail |
| Location : | Lot #205, Elv/Depth :802 | |||||||||
| Comment : | Recompaction is required. | |||||||||
| 07/29/2025 | 3 | 15.5 | 91.9 | 2025-025 SP | 104.5 | 13.2 | 87.9 | 95 | D2937 | Fail |
| Location : | Lot #200, Elv/Depth :803 | |||||||||
| Comment : | Recompaction is required. | |||||||||
Technician Signature / DateSean Willett, July 29, 2025
Reviewer Name / DateKenneth Mosman, August 11, 2025
