Skip to content

Density Test Report

Date :08/01/2025
Project No :2025C160
Client Company :Artisan
Arrival Time :08/01/2025 08:30
Onsite Hours :
Name of the Project :Rockmart Township - 115 Felton Drive
Project Location :Rockmart
Weather :Sunny - wet site
Departure Time :08/01/2025
ASEC Technician Name :Sean Willett

Observations/Finding

Test Date Test Number Moisture Content (%) Dry Density (pcf) Proctor Number Max. Dry Density (pcf) Optimum Moisture (%) Compaction (%) Specified Compaction (%) ASTM Test Method Pass/Fail
08/01/2025 1 21.9 86.7 2025-025 SP 104.5 13.2 83.0 95 D2937 Fail
Location : Lot #58, Elv/Depth :4 feet below finished grade
Comment : In-situ moisture contents well above optimum moisture content.
08/01/2025 2 29.4 84.3 2025-012 SP 105.6 18.9 79.8 95 D2937 Fail
Location : Lot #55, Elv/Depth :-7ft
Comment : In-situ moisture contents well above optimum moisture content.
Technician Signature / DateSean Willett, August 1, 2025
Reviewer Name / DateKenneth Mosman, August 11, 2025