Density Test Report

Date :08/08/2025
Project No :2025C160
Client Company :Artisan
Arrival Time :08/08/2025 08:30
Onsite Hours :
Name of the Project :Rockmart Township - 115 Felton Drive
Project Location :Rockmart
Weather :Overcast
Departure Time :08/08/2025
ASEC Technician Name :Sean Willett

Observations/Finding

Test Date Test Number Moisture Content (%) Dry Density (pcf) Proctor Number Max. Dry Density (pcf) Optimum Moisture (%) Compaction (%) Specified Compaction (%) ASTM Test Method Pass/Fail
08/08/2025 1 15.8 98.9 2025-012 SP 105.6 18.9 93.7 95 D2937 Fail
Location : Lot #58, Elv/Depth :799
Comment : Recompaction necessary
08/08/2025 2 20.3 94.2 2025-012 SP 105.6 18.9 89.2 95 D2937 Fail
Location : Lot #60, Elv/Depth :799
Comment : Contractor is compacting this area again with a sheep-foot roller and loaded dump trucks
08/08/2025 3 22.7 94.0 2025-012 SP 105.6 18.9 89.0 95 D2937 Fail
Location : Lot #58, Elv/Depth :801
Comment : Contrator is scarifying fill and allowing time to aerate before recompaction
08/08/2025 4 20.9 92.3 2025-012 SP 105.6 18.9 87.4 95 D2937 Fail
Location : Lot #60, Elv/Depth :801
Comment : Recompaction is required
Technician Signature / DateSean Willett, August 8, 2025
Reviewer Name / DateKenneth Mosman, August 12, 2025