- Home
- Density Test Report Report ID: 84586
- Edit Download Report
Density Test Report
Date :08/19/2025
Project No :2025C215
Client Company :Artisan
Arrival Time :08/19/2025 9:00
Onsite Hours :07:30
Name of the Project :NW Unit 4 Parkway Ext. Phase 1
Project Location :Dallas
Weather :sunny
Departure Time :08/19/2025 16:30
ASEC Technician Name :Aminullah Azimi
Observations/Finding
| Test Date | Test Number | Moisture Content (%) | Dry Density (pcf) | Proctor Number | Max. Dry Density (pcf) | Optimum Moisture (%) | Compaction (%) | Specified Compaction (%) | ASTM Test Method | Pass/Fail |
|---|---|---|---|---|---|---|---|---|---|---|
| 08/19/2025 | 1 | 23.5 | 111.9 | 2025-032 SP | 94.9 | 25.0 | 95.5 | 95 | D6938 | Pass |
| Location : | Between MHB9 and MH9, Elv/Depth :3 feet below finished grade | |||||||||
| Comment : | Gauge Serial No. :30942 | |||||||||
| 08/19/2025 | 2 | 24.1 | 90.7 | 2025-032 SP | 94.9 | 25.0 | 95.6 | 95 | D6938 | Pass |
| Location : | 10 feet to the north of MHB9, Elv/Depth :2 feet below finished grade | |||||||||
| Comment : | Gauge Serial No. :30942 | |||||||||
| 08/19/2025 | 3 | 22.3 | 90.7 | 2025-032 SP | 94.9 | 25.0 | 95.6 | 95 | D6938 | Pass |
| Location : | 12 feet to the south of MH9, Elv/Depth :3 feet below finished grade | |||||||||
| Comment : | Gauge Serial No. :30942 | |||||||||
Technician Signature / DateAminullah Azimi, August 19, 2025
Reviewer Name / DateKenneth Mosman, September 12, 2025
