- Home
- Daily Field Report Report ID: 84762
- Edit Download Report
Daily Field Report
Observations/Finding
As requested, the site was visited by our AS Engineering and Consulting (ASEC) representative for the purpose of providing quality control inspection and testing services. Visual observation techniques were employed to verify compliance with project drawing/specifications, applicable codes, and materials submittals. The following observations were observed on site this day.
Our ASEC representative was on site as requested and observed the grading contractor continue placing fill for the building pads and roadway. Fill placement was performed for Lot#61 and on the roadway. The hauled dirt was spread by a 61 Pxi Komatsu Bulldozer, compacted with a sheeps-foot roller. Results of density testing are attached.
We appreciate the opportunity to be of service to you on this project. If you have any questions regarding this report, please feel free to contact us. We will be more than happy to discuss it with you.

Picttture depicting the road and Lot#61 under backfilling
