Daily Field Report

Date :09/02/2025
Project No :2025C160
Client Company :Artisan
Arrival Time :09/02/2025 08:00
Onsite Hours :07:30
Name of the Project :Rockmart Township - 115 Felton Drive
Project Location :Rockmart
Weather :Sunny
Departure Time :09/02/2025 15:30
ASEC Technician Name :Sean Willett

Observations/Finding

As requested, the site was visited by our AS Engineering and Consulting (ASEC) representative for the purpose of providing quality control inspection and testing services. Visual observation techniques were employed to verify compliance with project drawing/specifications, applicable codes, and materials
submittals. The following observations were observed on site this day.

Our ASEC representative was on site as requested by the contractor (Wilbanks) for the observation/testing of the placement of fill/backfill. The contractor placed a mix of topsoil and structural fill across greenspace located on the embankment of Lots #170 through #180. The contractor cut roadways around Lots #170 – #180 and placed fill across these lots to bring them to finished grade. Fill was placed in approximate 8-to-12-inch lifts and rolled via a sheep-foot roller. All test results were provided to the contractor.

We appreciate the opportunity to be of service to you on this project. If you have any questions regarding this report, please feel free to contact us. We will be more than happy to discuss it with you.

top soil in greenspace

site pic

site pic

Technician Signature / DateSean Willett, September 2, 2025
Reviewer Name / DateKenneth Mosman, September 17, 2025