- Home
- Density Test Report Report ID: 85367
- Edit Download Report
Density Test Report
Date :09/09/2025
Project No :2025C216
Client Company :Artisan
Arrival Time :09/09/2025 08:30
Onsite Hours :08:30
Name of the Project :NW (Lots) Unit 4 PH 1A & 1B
Project Location :Dallas
Weather :sunny
Departure Time :09/09/2025 17:00
ASEC Technician Name :Sean Willett
Observations/Finding
| Test Date | Test Number | Moisture Content (%) | Dry Density (pcf) | Proctor Number | Max. Dry Density (pcf) | Optimum Moisture (%) | Compaction (%) | Specified Compaction (%) | ASTM Test Method | Pass/Fail |
|---|---|---|---|---|---|---|---|---|---|---|
| 09/09/2025 | 1 | 16.1 | 93.5 | 2025-032 SP | 94.9 | 25.0 | 98.5 | 98 | D6938 | Pass |
| Location : | SSMH C3, Elv/Depth :at finished grade | |||||||||
| Comment : | Field proctor: 102.0 pcf maximum dry density @ 15% optimum moisture content. | Gauge Serial No. :77-19952 | ||||||||
| 09/09/2025 | 2 | 19.3 | 94.7 | 2025-032 SP | 94.9 | 25.0 | 99.8 | 98 | D6938 | Pass |
| Location : | SSMH C4, Elv/Depth :at finished grade | |||||||||
| Comment : | Field proctor: 102.0 pcf maximum dry density @ 15% optimum moisture content. | Gauge Serial No. :77-19952 | ||||||||
Technician Signature / DateSean Willett, September 9, 2025
Reviewer Name / DateKenneth Mosman, October 16, 2025
