Density Test Report

Date :09/03/2025
Project No :2025C215
Client Company :Artisan
Arrival Time :09/03/2025 09:30
Onsite Hours :07:30
Name of the Project :NW Unit 4 Parkway Ext. Phase 1
Project Location :Dallas
Weather :Sunny
Departure Time :09/03/2025 17:00
ASEC Technician Name :Safiullah Momand

Observations/Finding

Test Date Test Number Moisture Content (%) Dry Density (pcf) Proctor Number Max. Dry Density (pcf) Optimum Moisture (%) Compaction (%) Specified Compaction (%) ASTM Test Method Pass/Fail
09/03/2025 1 13.6 97.4 2025-031 SP 101.0 20.7 96.4 95 D2937 Pass
Location : Lot #10, Elv/Depth :4 feet below finished grade
Comment :
09/03/2025 2 16.9 88.5 2025-031 SP 101.0 20.7 87.6 95 D6938 Fail
Location : Lot #8, Elv/Depth :3 feet below finished grade
Comment : Gauge Serial No. :3430
09/03/2025 3 16.2 91.2 2025-031 SP 101.0 20.7 90.3 95 D6938 Fail
Location : Lot #9, Elv/Depth :3 feet below finished grade
Comment : Recompaction required. Gauge Serial No. :3430
09/03/2025 4 14.4 96.7 2025-031 SP 101.0 20.7 95.7 95 D6938 Pass
Location : Lot #10, Elv/Depth :3 feet to finished grade
Comment : Gauge Serial No. :3430
Technician Signature / DateSafiullah Momand, September 3, 2025
Reviewer Name / DateKenneth Mosman, September 17, 2025