Density Test Report

Date :09/05/2025
Project No :2025C215
Client Company :Artisan
Arrival Time :09/05/2025 09:30
Onsite Hours :07:00
Name of the Project :NW Unit 4 Parkway Ext. Phase 1
Project Location :Dallas
Weather :Sunny
Departure Time :09/05/2025 16:30
ASEC Technician Name :Safiullah Momand

Observations/Finding

Test Date Test Number Moisture Content (%) Dry Density (pcf) Proctor Number Max. Dry Density (pcf) Optimum Moisture (%) Compaction (%) Specified Compaction (%) ASTM Test Method Pass/Fail
09/05/2025 1 11.7 98.7 2025-031 SP 101.0 20.7 97.7 98 D2937 Fail
Location : Lot #11, Elv/Depth :at finished grade
Comment :
09/05/2025 2 19.0 93.4 2025-031 SP 101.0 20.7 92.5 98 D2937 Fail
Location : Lot #7, Elv/Depth :at finished grade
Comment : Recompaction required.
09/05/2025 3 11.2 101.8 2025-031 SP 101.0 20.7 100.8 95 D2937 Pass
Location : between Sewer line A3 & A4, Elv/Depth :5 feet below finished grade
Comment :
Technician Signature / DateSafiullah Momand, September 5, 2025
Reviewer Name / DateKenneth Mosman, October 16, 2025