- Density Test Report Report ID: 85510
- Edit Download Report
Density Test Report
Date :09/05/2025
Project No :2025C215
Client Company :Artisan
Arrival Time :09/05/2025 09:30
Onsite Hours :07:00
Name of the Project :NW Unit 4 Parkway Ext. Phase 1
Project Location :Dallas
Weather :Sunny
Departure Time :09/05/2025 16:30
ASEC Technician Name :Safiullah Momand
Observations/Finding
| Test Date | Test Number | Moisture Content (%) | Dry Density (pcf) | Proctor Number | Max. Dry Density (pcf) | Optimum Moisture (%) | Compaction (%) | Specified Compaction (%) | ASTM Test Method | Pass/Fail |
|---|---|---|---|---|---|---|---|---|---|---|
| 09/05/2025 | 1 | 11.7 | 98.7 | 2025-031 SP | 101.0 | 20.7 | 97.7 | 98 | D2937 | Fail |
| Location : | Lot #11, Elv/Depth :at finished grade | |||||||||
| Comment : | ||||||||||
| 09/05/2025 | 2 | 19.0 | 93.4 | 2025-031 SP | 101.0 | 20.7 | 92.5 | 98 | D2937 | Fail |
| Location : | Lot #7, Elv/Depth :at finished grade | |||||||||
| Comment : | Recompaction required. | |||||||||
| 09/05/2025 | 3 | 11.2 | 101.8 | 2025-031 SP | 101.0 | 20.7 | 100.8 | 95 | D2937 | Pass |
| Location : | between Sewer line A3 & A4, Elv/Depth :5 feet below finished grade | |||||||||
| Comment : | ||||||||||
Technician Signature / DateSafiullah Momand, September 5, 2025
Reviewer Name / DateKenneth Mosman, October 16, 2025