Density Test Report

Date :09/02/2025
Project No :2025C215
Client Company :Artisan
Arrival Time :09/02/2025 9:00
Onsite Hours :05:00
Name of the Project :NW Unit 4 Parkway Ext. Phase 1
Project Location :Dallas
Weather :sunny
Departure Time :09/02/2025 14:00
ASEC Technician Name :Aminullah Azimi

Observations/Finding

Test Date Test Number Moisture Content (%) Dry Density (pcf) Proctor Number Max. Dry Density (pcf) Optimum Moisture (%) Compaction (%) Specified Compaction (%) ASTM Test Method Pass/Fail
09/02/2025 1 17.1 97.4 2025-031 SP 101.0 20.7 96.4 95 D6938 Pass
Location : Sewer trench 38 feet to the north of MH5, Elv/Depth :4 feet below finished grade
Comment : Gauge Serial No. :30942
09/02/2025 2 17.6 96.2 2025-031 SP 101.0 20.7 95.2 95 D6938 Pass
Location : Sewer trench 63 feet to the south of MH5A, Elv/Depth :3 feet below finished grade
Comment : Gauge Serial No. :30942
09/02/2025 3 17.1 97.3 2025-031 SP 101.0 20.7 96.3 95 D6938 Pass
Location : Sewer trench 3 feet to the north of MH5A, Elv/Depth :3 feet below finished grade
Comment : Gauge Serial No. :30942
09/02/2025 4 19.5 96.4 2025-031 SP 101.0 20.7 95.4 95 D6938 Pass
Location : Service line Lot#3, Elv/Depth :3 feet below finished grade
Comment : Gauge Serial No. :30942
09/02/2025 5 18.2 96.5 2025-031 SP 101.0 20.7 95.5 95 D6938 Pass
Location : Service line Lot#2, Elv/Depth :3 feet below finished grade
Comment : Gauge Serial No. :30942
09/02/2025 6 18.1 96.5 2025-031 SP 101.0 20.7 95.5 95 D6938 Pass
Location : Sewer trench 12 feet to the south of MH5A, Elv/Depth :2 feet below finished grade
Comment : Gauge Serial No. :30942
09/02/2025 7 17.1 96.4 2025-031 SP 101.0 20.7 95.4 95 D6938 Pass
Location : Sewer trench 61 feet to the south of MH5A, Elv/Depth :2 feet below finished grade
Comment : Gauge Serial No. :30942
Technician Signature / DateAminullah Azimi, September 2, 2025
Reviewer Name / DateKenneth Mosman, September 17, 2025