- Home
- Density Test Report Report ID: 86116
- Edit Download Report
Density Test Report
Date :09/17/2025
Project No :2025C224
Client Company :C. W. MATTHEWS CONTRACTING CO., INC.
Arrival Time :09/17/2025 7:00
Onsite Hours :12:00
Name of the Project :PDK Airport - RUNWAY 3R-21L KEEL REPLACEMENT
Project Location :PDK AIRPORT, DEKALB County, GA
Weather :sunny
Departure Time :09/17/2025 19:00
ASEC Technician Name :Aminullah Azimi
Observations/Finding
| Test Date | Test Number | Moisture Content (%) | Dry Density (pcf) | Proctor Number | Max. Dry Density (pcf) | Optimum Moisture (%) | Compaction (%) | Specified Compaction (%) | ASTM Test Method | Pass/Fail |
|---|---|---|---|---|---|---|---|---|---|---|
| 09/17/2025 | 1 | 8 | 123.6 | 2025-037-MP | 132.9 | 8.2 | 93.0 | 100 | D6938 | Fail |
| Location : | Phase 1C from STA 1058+63 to 1064+40, Elv/Depth :at finished grade | |||||||||
| Comment : | Gauge Serial No. :38069 | |||||||||
| 09/17/2025 | 2 | 7.2 | 124.3 | 2025-037-MP | 132.9 | 8.2 | 93.5 | 100 | D6938 | Fail |
| Location : | Phase 1C from STA 1058+63 to 1064+40, Elv/Depth :at finished grade | |||||||||
| Comment : | Gauge Serial No. :38069 | |||||||||
| 09/17/2025 | 3 | 7.1 | 124.1 | 2025-037-MP | 132.9 | 8.2 | 93.4 | 100 | D6938 | Fail |
| Location : | Phase 1C from STA 1058+63 to 1064+40, Elv/Depth :at finished grade | |||||||||
| Comment : | Gauge Serial No. :38069 | |||||||||
| 09/17/2025 | 4 | 8 | 123.7 | 2025-037-MP | 132.9 | 8.2 | 93.1 | 100 | D6938 | Fail |
| Location : | Phase 1C from STA 1058+63 to 1064+40, Elv/Depth :at finished grade | |||||||||
| Comment : | Gauge Serial No. :38069 | |||||||||
| 09/17/2025 | 5 | 7.2 | 124.2 | 2025-037-MP | 132.9 | 8.2 | 93.5 | 100 | D6938 | Fail |
| Location : | Phase 1C from STA 1058+63 to 1064+40, Elv/Depth :at finished grade | |||||||||
| Comment : | Gauge Serial No. :38069 | |||||||||
| 09/17/2025 | 6 | 8.3 | 123.0 | 2025-037-MP | 132.9 | 8.2 | 92.6 | 100 | D6938 | Fail |
| Location : | Phase 1C from STA 1058+63 to 1064+40, Elv/Depth :at finished grade | |||||||||
| Comment : | Gauge Serial No. :38069 | |||||||||
| 09/17/2025 | 7 | 8.1 | 123.2 | 2025-037-MP | 132.9 | 8.2 | 92.7 | 100 | D6938 | Fail |
| Location : | Phase 1C from STA 1058+63 to 1064+40, Elv/Depth :at finished grade | |||||||||
| Comment : | Gauge Serial No. :38069 | |||||||||
| 09/17/2025 | 8 | 7.6 | 124.8 | 2025-037-MP | 132.9 | 8.2 | 93.9 | 100 | D6938 | Fail |
| Location : | Phase 1C from STA 1058+63 to 1064+40, Elv/Depth :at finished grade | |||||||||
| Comment : | Gauge Serial No. :38069 | |||||||||
| 09/17/2025 | 9 | 7.5 | 124.7 | 2025-037-MP | 132.9 | 8.2 | 93.8 | 100 | D6938 | Fail |
| Location : | Phase 1C from STA 1058+63 to 1064+40, Elv/Depth :at finished grade | |||||||||
| Comment : | Gauge Serial No. :38069 | |||||||||
| 09/17/2025 | 10 | 7.3 | 124.3 | 2025-037-MP | 132.9 | 8.2 | 93.5 | 100 | D6938 | Fail |
| Location : | Phase 1C from STA 1058+63 to 1064+40, Elv/Depth :at finished grade | |||||||||
| Comment : | Gauge Serial No. :38069 | |||||||||
| 09/17/2025 | 11 | 7.5 | 124.9 | 2025-037-MP | 132.9 | 8.2 | 94.0 | 100 | D6938 | Fail |
| Location : | Phase 1C from STA 1058+63 to 1064+40, Elv/Depth :at finished grade | |||||||||
| Comment : | Gauge Serial No. :38069 | |||||||||
Technician Signature / DateAminullah Azimi, September 17, 2025
Reviewer Name / DateKenneth Mosman, October 10, 2025
