Skip to content

Density Test Report

Date :09/19/2025
Project No :2025C224
Client Company :C. W. MATTHEWS CONTRACTING CO., INC.
Arrival Time :09/19/2025 12:00
Onsite Hours :06:30
Name of the Project :PDK Airport - RUNWAY 3R-21L KEEL REPLACEMENT
Project Location :PDK AIRPORT, DEKALB County, GA
Weather :sunny
Departure Time :09/19/2025 18:30
ASEC Technician Name :Aminullah Azimi

Observations/Finding

Test Date Test Number Moisture Content (%) Dry Density (pcf) Proctor Number Max. Dry Density (pcf) Optimum Moisture (%) Compaction (%) Specified Compaction (%) ASTM Test Method Pass/Fail
09/19/2025 1 9.2 121.0 2025-037-MP 132.9 8.2 91.0 100 D6938 Fail
Location : Phase 1D, Elv/Depth :at finished grade
Comment : Gauge Serial No. :38069
09/19/2025 2 8.6 121.7 2025-037-MP 132.9 8.2 91.6 100 D6938 Fail
Location : Phase 1D, Elv/Depth :at finished grade
Comment : Gauge Serial No. :38069
09/19/2025 3 8.6 122.3 2025-037-MP 132.9 8.2 92.0 100 D6938 Fail
Location : Phase 1D, Elv/Depth :at finished grade
Comment : Gauge Serial No. :38069
09/19/2025 4 8.6 117.4 2025-037-MP 132.9 8.2 88.3 100 D6938 Fail
Location : Phase 1D, Elv/Depth :at finished grade
Comment : Gauge Serial No. :38069
09/19/2025 5 9.2 119.9 2025-037-MP 132.9 8.2 90.2 100 D6938 Fail
Location : Phase 1D, Elv/Depth :at finished grade
Comment : Gauge Serial No. :38069
Technician Signature / DateAminullah Azimi, September 19, 2025
Reviewer Name / DateKenneth Mosman, October 10, 2025