Density Test Report

Date :09/23/2025
Project No :2025C216
Client Company :Artisan
Arrival Time :09/23/2025 10:00
Onsite Hours :
Name of the Project :NW (Lots) Unit 4 PH 1A & 1B
Project Location :Dallas
Weather :Overcast
Departure Time :09/23/2025
ASEC Technician Name :Sean Willett

Observations/Finding

Test Date Test Number Moisture Content (%) Dry Density (pcf) Proctor Number Max. Dry Density (pcf) Optimum Moisture (%) Compaction (%) Specified Compaction (%) ASTM Test Method Pass/Fail
09/23/2025 1 19.0 83.1 2025-031 SP 101.0 20.7 82.3 98 D2937 Fail
Location : SSMH pipeline 9A, Elv/Depth :2 feet below finished grade
Comment : Recompaction required.
09/23/2025 2 6.4 94.1 2025-031 SP 101.0 20.7 93.2 98 D2937 Fail
Location : SSMH pipeline 9a, Elv/Depth :2 feet below finished grade
Comment : Recompaction required.
Technician Signature / DateSean Willett, September 23, 2025
Reviewer Name / DateKenneth Mosman, October 16, 2025