- Home
- Daily Field Report Report ID: 86235
- Edit Download Report
Daily Field Report
Observations/Finding
As requested, the site was visited by our AS Engineering and Consulting (ASEC) representative for the purpose of providing quality control inspection and testing services. Visual observation techniques were employed to verify compliance with project drawing/specifications, applicable codes, and materials submittals. The following observations were observed on site this day.
Our ASEC representative was on site as requested by the contractor for the observation/testing of the placement of concrete for the cast in place wall footing. Concrete testing was performed from the middle of the sample out of the first concrete truck on site. The concrete appeared to have a high water/cement ratio. The slump test was recorded at 8.5 inches (as shown in picture). The contractor was informed of the test results. Five (5) cylinders were cast from this sample and will be transported to the lab once they have cured on site for 24 hours.
We appreciate the opportunity to be of service to you on this project. If you have any questions regarding this report, please feel free to contact us. We will be more than happy to discuss it with you.

cylinder curing container

footing

footing

slump test