- Density Test Report Report ID: 86674
- Edit Download Report
Density Test Report
Date :09/15/2025
Project No :2025C215
Client Company :Artisan
Arrival Time :09/15/2025 08:00
Onsite Hours :07:30
Name of the Project :NW Unit 4 Parkway Ext. Phase 1
Project Location :Dallas
Weather :Sunny
Departure Time :09/15/2025 15:30
ASEC Technician Name :Austin Coleman
Observations/Finding
| Test Date | Test Number | Moisture Content (%) | Dry Density (pcf) | Proctor Number | Max. Dry Density (pcf) | Optimum Moisture (%) | Compaction (%) | Specified Compaction (%) | ASTM Test Method | Pass/Fail |
|---|---|---|---|---|---|---|---|---|---|---|
| 09/15/2025 | 1 | 14.4 | 104.0 | 2025-033 SP | 104.0 | 16.2 | Check | |||
| Location : | Roadway near Manhole A5, Elv/Depth :6 feet below finished grade | |||||||||
| Comment : | ||||||||||
| 09/15/2025 | 6 | 13.5 | 104.2 | 2025-033 SP | 104.0 | 16.2 | 100.2 | 95 | D6938 | Pass |
| Location : | Roadway near Manhole A5, Elv/Depth :6 feet below finished grade | |||||||||
| Comment : | Gauge Serial No. :29588 | |||||||||
Technician Signature / DateAustin Coleman, September 15, 2025
Reviewer Name / DateKenneth Mosman, October 16, 2025