Skip to content

Density Test Report

Date :09/16/2025
Project No :2025C215
Client Company :Artisan
Arrival Time :09/16/2025 08:00
Onsite Hours :07:30
Name of the Project :NW Unit 4 Parkway Ext. Phase 1
Project Location :Dallas
Weather :Sunny
Departure Time :09/16/2025 15:30
ASEC Technician Name :Austin Coleman

Observations/Finding

Test Date Test Number Moisture Content (%) Dry Density (pcf) Proctor Number Max. Dry Density (pcf) Optimum Moisture (%) Compaction (%) Specified Compaction (%) ASTM Test Method Pass/Fail
09/16/2025 1 12.8 106.0 FP 0 Check
Location : MH A9-A11, Elv/Depth :4 feet below finished grade
Comment : 107.7 pcf maximum dry density @ 13.0% optimum moisture content.
09/16/2025 2 12.2 105.1 2025-035 SP 107.8 13.0 97.5 95 D6938 Pass
Location : A9-A10, Elv/Depth :4 feet below finished grade
Comment : Gauge Serial No. :29588
09/16/2025 3 11.2 105.8 2025-035 SP 107.8 13.0 98.1 95 D6938 Pass
Location : A10-A11, Elv/Depth :4 feet below finished grade
Comment : Gauge Serial No. :29588
09/16/2025 4 11.3 107.5 2025-035 SP 107.8 13.0 99.7 95 D6938 Pass
Location : A9-A10, Elv/Depth :4 feet below finished grade
Comment : Gauge Serial No. :29588
10/16/2025 5 12.1 107.3 2025-035 SP 107.8 13.0 99.5 95 D6938 Pass
Location : A10-A11, Elv/Depth :4 feet below finished grade
Comment : Gauge Serial No. :29588
Technician Signature / DateAustin Coleman, September 16, 2025
Reviewer Name / DateKenneth Mosman, October 16, 2025