Skip to content

Density Test Report

Date :10/16/2025
Project No :2025C260
Client Company :Artisan
Arrival Time :10/16/2025 13:00
Onsite Hours :05:30
Name of the Project :NW (PHASE 2) Parkway Extension
Project Location :Dallas
Weather :Sunny
Departure Time :10/16/2025 18:30
ASEC Technician Name :Clyde Smith

Observations/Finding

Test Date Test Number Moisture Content (%) Dry Density (pcf) Proctor Number Max. Dry Density (pcf) Optimum Moisture (%) Compaction (%) Specified Compaction (%) ASTM Test Method Pass/Fail
10/16/2025 1 23.1 92.9 2025-032 SP 94.9 25.0 97.9 95 D6938 Pass
Location : Back of Lot #69, Elv/Depth :16 feet below finished grade
Comment : Gauge Serial No. :29855
10/16/2025 2 16.4 103.2 2025-036 SP 107.0 18.5 96.4 95 D6938 Pass
Location : Back of Lot #70, Elv/Depth :16 feet below finished grade
Comment : Gauge Serial No. :29855
10/16/2025 3 15.9 104.7 2025-035 SP 107.8 13.0 97.1 95 D6938 Pass
Location : Lot #69, Elv/Depth :14 feet below finished grade
Comment : Gauge Serial No. :29855
10/16/2025 4 22.7 91.8 2025-032 SP 94.9 25.0 96.7 95 D6938 Pass
Location : Lot #70, Elv/Depth :14 feet below finished grade
Comment : Gauge Serial No. :29855
Technician Signature / DateClyde Smith, October 16, 2025
Reviewer Name / DateKenneth Mosman, October 17, 2025