Skip to content

Density Test Report

Date :10/15/2025
Project No :2025C211
Client Company :Pulte
Arrival Time :10/15/2025 14:30
Onsite Hours :03:00
Name of the Project :Haley's Bluff - Philadelphia Rd.
Project Location :Jasper
Weather :Sunny
Departure Time :10/15/2025 17:30
ASEC Technician Name :Sean Willett

Observations/Finding

Test Date Test Number Moisture Content (%) Dry Density (pcf) Proctor Number Max. Dry Density (pcf) Optimum Moisture (%) Compaction (%) Specified Compaction (%) ASTM Test Method Pass/Fail
10/15/2025 1 23.4 86.6 FP 1 95.0 22.0 91.2 95 D6938 Fail
Location : Deceleration Lane , Elv/Depth :7.5 feet below finished grade
Comment : Recompaction required Gauge Serial No. :77-19952
10/15/2025 2 21.6 117.6 FP 1 95.0 22.0 101.8 95 D6938 Pass
Location : Deceleration Lane, Elv/Depth :7.5 feet below finished grade
Comment : Gauge Serial No. :77-19952
10/15/2025 3 18.4 122.9 2025-048 109.2 16.1 95.1 95 D6938 Pass
Location : Deceleration Lane, Elv/Depth :7.5 feet below finished grade
Comment : a mix of soils in this area from the benching slope cut of the roadway Gauge Serial No. :77-19952
10/15/2025 4 17.9 106.6 FP 1 95.0 22.0 95.2 95 D6938 Pass
Location : Deceleration Lane, Elv/Depth :7.5 feet below finished grade
Comment : Gauge Serial No. :77-19952
10/15/2025 5 21.0 95.8 FP 1 95.0 22.0 100.8 95 D6938 Pass
Location : Deceleration Lane (retest #1), Elv/Depth :7.5 feet below finished grade
Comment : Retest of Test #1 Gauge Serial No. :77-19952
Technician Signature / DateSean Willett, October 15, 2025
Reviewer Name / DateKenneth Mosman, October 20, 2025