- Daily Field Report Report ID: 87268
- Edit Download Report
Daily Field Report
Observations/Finding
As requested, the site was visited by our AS Engineering and Consulting (ASEC) representative for the purpose of providing quality control inspection and testing services. Visual observation techniques were employed to verify compliance with project drawing/specifications, applicable codes, and materials submittals. The following observations were observed on site this day.
Work started between C4 and C5 and continued up to C5, where the crew installed a 90-degree pipe bend with an elevation change of approximately 3 feet toward the direction of C6. Excavation and pipe installation between C5 and C6 were paused midway to adjust alignment and slope. Meanwhile, a new task began at C3, where the crew cut the existing pipe and installed a T-joint connection to redirect flow in accordance with the revised site plan. All work was performed following field specifications.
We appreciate the opportunity to be of service to you on this project. If you have any questions regarding this report, please feel free to contact us. We will be more than happy to discuss it with you