Daily Field Report

Date :10/21/2025
Project No :2025C244
Client Company :McCallan Group
Arrival Time :10/21/2025 07:30
Onsite Hours :10:45
Name of the Project :Cassville Rd tract, proposed Burrito Wrap
Project Location :Cartersville
Weather :cloudy
Departure Time :10/21/2025 18:15
ASEC Technician Name :Samara Simha Reddy Kandi

Observations/Finding

As requested, the site was visited by our AS Engineering and Consulting (ASEC) representative for the purpose of providing quality control inspection and testing services. Visual observation techniques were employed to verify compliance with project drawing/specifications, applicable codes, and materials submittals. The following observations were observed on site this day.

Excavation and installation continued today at the Cassville Road tract for the French drain (“burrito wrap”) project. The crew continued construction along the line between B7.1 and B7.2. Work involved excavating the trench, installing the drainage pipe, and backfilling upon completion. Alignment and slope were checked for consistency with the previously completed section. The trench was prepared with densified gravel bedding to support the pipe, and excavated soil was stockpiled in a designated area. All operations were carried out as per project specifications.

We appreciate the opportunity to be of service to you on this project. If you have any questions regarding this report, please feel free to contact us. We will be more than happy to discuss it with you.

Technician Signature / DateSamara Simha Reddy Kandi, October 21, 2025
Reviewer Name / DateKenneth Mosman, October 27, 2025