Daily Field Report
Observations/Finding
As requested, the site was visited by our AS Engineering and Consulting (ASEC) representative for the purpose of providing quality control inspection and testing services. Visual observation techniques were employed to verify compliance with project drawing/specifications, applicable codes, and materials submittals. The following observations were observed on site this day.
Excavation and installation continued today at the Cassville Road tract for the French drain (“burrito wrap”) project. The crew continued construction along the line between B7.1 and B7.2. Work involved excavating the trench, installing the drainage pipe, and backfilling upon completion. Alignment and slope were checked for consistency with the previously completed section. The trench was prepared with densified gravel bedding to support the pipe, and excavated soil was stockpiled in a designated area. All operations were carried out as per project specifications.
We appreciate the opportunity to be of service to you on this project. If you have any questions regarding this report, please feel free to contact us. We will be more than happy to discuss it with you.