- Home
- Daily Field Report Report ID: 87495
- Edit Download Report
Daily Field Report
Observations/Finding
As requested, the site was visited by our AS Engineering and Consulting (ASEC) representative for the purpose of providing quality control inspection and testing services. Visual observation techniques were employed to verify compliance with project drawing/specifications, applicable codes, and materials submittals. The following observations were observed on site this day.
On the above date our representative from AS engineering and consultant was on site to observe the grading contractor continue placing rock fill for the slope embankment. The fill was placed in accordance with project plans and specifications for compaction requirements being observed by proof-rolling using an off- road loaded dump truck. The fill placement was observed from depths ranging from 32′ to 28′ below finished grade.
We appreciate the opportunity to be of service to you on this project. If you have any questions regarding this report, please feel free to contact us. We will be more than happy to discuss it with you.



Slope embankment rock fill