- Home
- Density Test Report Report ID: 87601
- Edit Download Report
Density Test Report
Date :11/07/2025
Project No :2025C211
Client Company :Pulte
Arrival Time :11/07/2025 08:00
Onsite Hours :07:00
Name of the Project :Haley's Bluff - Philadelphia Rd.
Project Location :Jasper
Weather :Sunny
Departure Time :11/07/2025 15:00
ASEC Technician Name :Sean Willett
Observations/Finding
| Test Date | Test Number | Moisture Content (%) | Dry Density (pcf) | Proctor Number | Max. Dry Density (pcf) | Optimum Moisture (%) | Compaction (%) | Specified Compaction (%) | ASTM Test Method | Pass/Fail |
|---|---|---|---|---|---|---|---|---|---|---|
| 11/07/2025 | 1 | 17.0 | 99.5 | FP 2 | 100.0 | 18.5 | 99.5 | 95 | D6938 | Pass |
| Location : | Back of Lot #4 (pond area by deceleration lane), Elv/Depth :1492 | |||||||||
| Comment : | Field Proctor 2 = 100.0 @ 18.5% | Gauge Serial No. :77-19952 | ||||||||
| 11/07/2025 | 2 | 15.1 | 101.0 | FP 2 | 100.0 | 18.5 | 101.0 | 95 | D6938 | Pass |
| Location : | Back of Lot #3 (pond area by deceleration lane), Elv/Depth :1492 | |||||||||
| Comment : | Field Proctor 2 = 100.0 @ 18.5% | Gauge Serial No. :77-19952 | ||||||||
| 11/07/2025 | 3 | 16.4 | 110.7 | FP 2 | 100.0 | 18.5 | 95.1 | 95 | D6938 | Pass |
| Location : | BC3 storm line, Elv/Depth :1 foot to 2 feet over pipeline | |||||||||
| Comment : | Field Proctor 2 = 100.0 @ 18.5% | Gauge Serial No. :77-19952 | ||||||||
| 11/07/2025 | 4 | 17.7 | 97.6 | FP 2 | 100.0 | 18.5 | 97.6 | 95 | D6938 | Pass |
| Location : | BC2 to BC3 stormline, Elv/Depth :1 foot to 2 feet over pipeline | |||||||||
| Comment : | Field Proctor 2 = 100.0 @ 18.5% | Gauge Serial No. :77-19952 | ||||||||
| 11/07/2025 | 5 | 16.8 | 98.3 | FP 2 | 100.0 | 18.5 | 98.3 | 95 | D6938 | Pass |
| Location : | Lower back of lot #4 (pond area), Elv/Depth :1489 | |||||||||
| Comment : | Field Proctor 2 = 100.0 @ 18.5% | Gauge Serial No. :77-19952 | ||||||||
Technician Signature / DateSean Willett, November 7, 2025
Reviewer Name / DateKenneth Mosman, November 10, 2025
