Skip to content

Density Test Report

Date :11/07/2025
Project No :2025C211
Client Company :Pulte
Arrival Time :11/07/2025 08:00
Onsite Hours :07:00
Name of the Project :Haley's Bluff - Philadelphia Rd.
Project Location :Jasper
Weather :Sunny
Departure Time :11/07/2025 15:00
ASEC Technician Name :Sean Willett

Observations/Finding

Test Date Test Number Moisture Content (%) Dry Density (pcf) Proctor Number Max. Dry Density (pcf) Optimum Moisture (%) Compaction (%) Specified Compaction (%) ASTM Test Method Pass/Fail
11/07/2025 1 17.0 99.5 FP 2 100.0 18.5 99.5 95 D6938 Pass
Location : Back of Lot #4 (pond area by deceleration lane), Elv/Depth :1492
Comment : Field Proctor 2 = 100.0 @ 18.5% Gauge Serial No. :77-19952
11/07/2025 2 15.1 101.0 FP 2 100.0 18.5 101.0 95 D6938 Pass
Location : Back of Lot #3 (pond area by deceleration lane), Elv/Depth :1492
Comment : Field Proctor 2 = 100.0 @ 18.5% Gauge Serial No. :77-19952
11/07/2025 3 16.4 110.7 FP 2 100.0 18.5 95.1 95 D6938 Pass
Location : BC3 storm line, Elv/Depth :1 foot to 2 feet over pipeline
Comment : Field Proctor 2 = 100.0 @ 18.5% Gauge Serial No. :77-19952
11/07/2025 4 17.7 97.6 FP 2 100.0 18.5 97.6 95 D6938 Pass
Location : BC2 to BC3 stormline, Elv/Depth :1 foot to 2 feet over pipeline
Comment : Field Proctor 2 = 100.0 @ 18.5% Gauge Serial No. :77-19952
11/07/2025 5 16.8 98.3 FP 2 100.0 18.5 98.3 95 D6938 Pass
Location : Lower back of lot #4 (pond area), Elv/Depth :1489
Comment : Field Proctor 2 = 100.0 @ 18.5% Gauge Serial No. :77-19952
Technician Signature / DateSean Willett, November 7, 2025
Reviewer Name / DateKenneth Mosman, November 10, 2025